  #2241  
Old Posted Aug 27, 2022, 4:18 PM
Klippenstein's Avatar
Klippenstein Klippenstein is offline
Rust Belt Motherland
 
Join Date: Apr 2021
Location: Chicago, IL
Posts: 766
Monday morning



Friday afternoon



It's hard to see from these pictures, but Monday the rebar wasn't in place for the next floor columns, but Friday afternoon they were for the floor above. They finished 2 floors of the core or at least the framing moved up for the 2nd. So, they're finally putting up 1+ floors a week. At this rate, this one could be topped out in under a year. The funny thing about this building though is that the floor plates are getting bigger higher up. And the shifting layouts add complexity especially higher. We'll see. It's fun to watch this one unfold.
Reply With Quote
     
     
  #2242  
Old Posted Aug 27, 2022, 5:30 PM
rivernorthlurker rivernorthlurker is offline
Registered User
 
Join Date: Dec 2018
Location: Chicago
Posts: 1,107
Sweeeet. This is getting good.

Quote:
Originally Posted by Klippenstein View Post
Monday morning

Friday afternoon



It's hard to see from these pictures, but Monday the rebar wasn't in place for the next floor columns, but Friday afternoon they were for the floor above. They finished 2 floors of the core or at least the framing moved up for the 2nd. So, they're finally putting up 1+ floors a week. At this rate, this one could be topped out in under a year. The funny thing about this building though is that the floor plates are getting bigger higher up. And the shifting layouts add complexity especially higher. We'll see. It's fun to watch this one unfold.
Reply With Quote
     
     
  #2243  
Old Posted Aug 28, 2022, 12:37 AM
bhawk66 bhawk66 is offline
Registered User
 
Join Date: Mar 2019
Posts: 521
So much concrete on this one. Wow. From the core to the pillars. Even the interior walls in the lobby are 15" thick.
Reply With Quote
     
     
  #2244  
Old Posted Aug 28, 2022, 4:38 AM
Mr Downtown's Avatar
Mr Downtown Mr Downtown is offline
Urbane observer
 
Join Date: Nov 2006
Posts: 4,386
On the "alley" side, there's a concrete pump with a motor the size of a small locomotive. I suppose that'll be needed when they get to 600 feet. I always wonder how they clean out for the night the hose/piping extending that far up. If I've done the math right, there would be more than 15 yards of concrete—two concrete trucks—in an 8-inch pipe that's 600 feet long!

Last edited by Mr Downtown; Aug 28, 2022 at 1:12 PM.
Reply With Quote
     
     
  #2245  
Old Posted Aug 28, 2022, 3:28 PM
donnie's Avatar
donnie donnie is offline
Registered User
 
Join Date: Feb 2011
Posts: 596
Reply With Quote
     
     
  #2246  
Old Posted Aug 28, 2022, 5:59 PM
Mr Downtown's Avatar
Mr Downtown Mr Downtown is offline
Urbane observer
 
Join Date: Nov 2006
Posts: 4,386
Right; but where do they dump all the leftover concrete? Truck it back to the readymix plant and make Jersey barriers from it before it sets?
Reply With Quote
     
     
  #2247  
Old Posted Aug 28, 2022, 6:04 PM
Klippenstein's Avatar
Klippenstein Klippenstein is offline
Rust Belt Motherland
 
Join Date: Apr 2021
Location: Chicago, IL
Posts: 766
Quote:
Originally Posted by Mr Downtown View Post
Right; but where do they dump all the leftover concrete? Truck it back to the readymix plant and make Jersey barriers from it before it sets?
They probably know pretty precisely how much concrete they’re going to need for the day.
Reply With Quote
     
     
  #2248  
Old Posted Aug 28, 2022, 6:08 PM
ithakas's Avatar
ithakas ithakas is offline
Registered User
 
Join Date: May 2014
Posts: 976
Thanks for the amazing photos Klippenstein! I haven't been able to make it over there as often as I'd hoped just yet, so it's nice being able to keep up with progress thanks to your posts.
Reply With Quote
     
     
  #2249  
Old Posted Aug 28, 2022, 7:06 PM
Mr Downtown's Avatar
Mr Downtown Mr Downtown is offline
Urbane observer
 
Join Date: Nov 2006
Posts: 4,386
Quote:
Originally Posted by Klippenstein View Post
They probably know pretty precisely how much concrete they’re going to need for the day.
Right; but I'm talking about the large amount of concrete left in the pipe at the end of the day. They clean from the top down.
Reply With Quote
     
     
  #2250  
Old Posted Aug 28, 2022, 7:09 PM
thegoatman thegoatman is offline
BANNED
 
Join Date: Oct 2021
Posts: 646
Theres this big vacant lot right next to NEMA thats very unattractive. After this is done, will NEMA 2 start?
Reply With Quote
     
     
  #2251  
Old Posted Aug 28, 2022, 7:21 PM
ithakas's Avatar
ithakas ithakas is offline
Registered User
 
Join Date: May 2014
Posts: 976
Quote:
Originally Posted by thegoatman View Post
Theres this big vacant lot right next to NEMA thats very unattractive. After this is done, will NEMA 2 start?
Crescent Heights still owns it, and mentioned they were starting to work on it in a Crain's interview maybe six months ago, but said it would be a couple years. They've got 640 W. Washington and the site at 420 N. May to work in the meantime I believe.
Reply With Quote
     
     
  #2252  
Old Posted Aug 28, 2022, 8:53 PM
Zapatan's Avatar
Zapatan Zapatan is offline
DENNAB
 
Join Date: Aug 2009
Location: NA - Europe
Posts: 6,063
Quote:
Originally Posted by ithakas View Post
Crescent Heights still owns it, and mentioned they were starting to work on it in a Crain's interview maybe six months ago, but said it would be a couple years. They've got 640 W. Washington and the site at 420 N. May to work in the meantime I believe.
They (Crescent Heights) have yet to release any info or renderings on a second tower. I assume that will happen before any activity.

That'd be awesome if it could happen though. Rumor has it it'd be higher than the first one, which is just under 900 feet.
Reply With Quote
     
     
  #2253  
Old Posted Aug 28, 2022, 11:22 PM
SolarWind's Avatar
SolarWind SolarWind is offline
Chicago
 
Join Date: Jun 2006
Posts: 5,476
August 25, 2022







Reply With Quote
     
     
  #2254  
Old Posted Aug 30, 2022, 4:06 AM
Klippenstein's Avatar
Klippenstein Klippenstein is offline
Rust Belt Motherland
 
Join Date: Apr 2021
Location: Chicago, IL
Posts: 766
Today





Reply With Quote
     
     
  #2255  
Old Posted Aug 31, 2022, 2:07 AM
BVictor1's Avatar
BVictor1 BVictor1 is offline
Registered User
 
Join Date: Sep 2002
Location: Chicago
Posts: 10,413
08.30.22


__________________
titanic1
Reply With Quote
     
     
  #2256  
Old Posted Aug 31, 2022, 2:36 AM
donnie's Avatar
donnie donnie is offline
Registered User
 
Join Date: Feb 2011
Posts: 596
Soooo London!!!!
Reply With Quote
     
     
  #2257  
Old Posted Sep 1, 2022, 11:38 PM
Klippenstein's Avatar
Klippenstein Klippenstein is offline
Rust Belt Motherland
 
Join Date: Apr 2021
Location: Chicago, IL
Posts: 766
Yesterday


This Morning




This Afternoon






Reply With Quote
     
     
  #2258  
Old Posted Sep 6, 2022, 12:37 AM
BVictor1's Avatar
BVictor1 BVictor1 is offline
Registered User
 
Join Date: Sep 2002
Location: Chicago
Posts: 10,413
09.05.22
__________________
titanic1
Reply With Quote
     
     
  #2259  
Old Posted Sep 8, 2022, 10:22 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,768
Facade Work Begins For 1000M Apartments In South Loop





Quote:
Curtain wall glazing has begun installation for the 73-story 1000M apartment tower at 1000 S Michigan Avenue in South Loop. Developer trio JK Equities, Time Equities, and Oak Capitals have planned for a total of 738 rental units in this most recent iteration, which will stand 788 feet upon its completion.

To better match market conditions after a construction hiatus the developers had converted the plans from what was previously an 832-foot-tall condominium skyscraper with 506 for-sale units. As part of the re-scoped plans, the developers were able to secure a $304.5 million loan from Goldman Sachs and Deutsche Bank.

Roughly half of the residences at 1000M will be studios, a quarter will be one-bedrooms, a fifth will be two-bedrooms, and the remaining units will be three-bedroom units. Penthouse offerings will reach sizes up to 3,000 square feet. There will also be 23 on-site affordable residences, comprised of 11 studios, six one-bedrooms, five two-bedrooms, and one three-bedroom.

McHugh Construction is serving as general contractor behind the project, with a full opening date targeted for 2025.
=================
ChiYimby
Reply With Quote
     
     
  #2260  
Old Posted Sep 9, 2022, 1:33 AM
Klippenstein's Avatar
Klippenstein Klippenstein is offline
Rust Belt Motherland
 
Join Date: Apr 2021
Location: Chicago, IL
Posts: 766
Quote:
Originally Posted by chris08876 View Post
Curtain wall glazing has begun installation for the 73-story 1000M apartment tower at 1000 S Michigan Avenue in South Loop. Developer trio JK Equities, Time Equities, and Oak Capitals have planned for a total of 738 rental units in this most recent iteration, which will stand 788 feet upon its completion.
If this is why you quoted the article, McHugh was the one to use this number in one of their press releases, but it's probably just the height of the concrete core. For some reason Yimby ran with this number, but the consensus on here was to wait for official confirmation. We have yet to see that change confirmed by Jahn.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > Skyscraper & Highrise Construction
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 11:42 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.