Quote:
Originally Posted by glenhebert View Post
Does anyone know why there is such slow movement on the Bayfront park in front of the new Warriors arena?
I don't know, but I speculate that the Warriors are helping fund it and since they didn't sell many tickets this last year, maybe there is a cash flow issue? it seemed to get underway, then just stopped
Reply With Quote
     
     
  #2482  
Old Posted Jun 1, 2021, 11:04 PM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
MB school

I got sent a notice that the comment period for the EIR for the K-8 school in MB is open. in the doc it says construction start is mid-2023. that may be what we already knew, but I at least needed the reminder
Reply With Quote
     
     
  #2483  
Old Posted Jun 7, 2021, 12:40 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
from a walk yesterday...

work along the Creek:





block 9W seen from Third St



Bayfront park site still inactive as far as I can tell (but Chase Center grounds open again)





I have to say that the plantings I saw seemed especially exuberant - not sure if that is a pandemic side-effect or not, but it was noticeable



the garage portion of UCSF's latest project



UCSF's psychiatry center in Dogpatch

Reply With Quote
     
     
  #2484  
Old Posted Jun 12, 2021, 9:41 PM
iamfishhead iamfishhead is offline
Registered User
 
Join Date: Jul 2016
Location: San Francisco
Posts: 202
Quote:
Originally Posted by timbad View Post
from a walk yesterday...
I don't remember if I mentioned this before, but the wine and cheese shop told us they're trying to get space for a patio right where your picture is. That'd be nice and a great complement to New Belgium down on the other side of the building.
Reply With Quote
     
     
  #2485  
Old Posted Jun 14, 2021, 9:48 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
been a while since it has come up, but they have been working on a somewhat significant piece of sewer infrastructure over by the Ramp (Terry Francois Blvd and Mariposa) for some time now. looking forward to that wrapping up soon hopefully



fencing around the intersection with the 19th St extension along the edge of Crane Cove Park has come down, so it is easier to access the park (on foot) from the south now





the roadway itself is still getting its final touches





Fourth St with the Weill Neurosciences building completed



the last portion to open was the street leading back to Third



block 6W has had all its fencing removed as well





so another piece of MB has been filled in, and means that the only construction going on in the MB core at the moment is UCSF's project in the far SE corner and block 9W, also fairly tucked out of sight. probably one of the calmest times in that respect in almost 20 years. (of course, the separation of Mission Rock from Mission Bay is arbitrary, and that is in full swing.)

anyway, nice to have sidewalks back!







the mews between this block and block 6E

Reply With Quote
     
     
  #2486  
Old Posted Jun 16, 2021, 1:26 AM
viewguysf's Avatar
viewguysf viewguysf is offline
Surrounded by Nature
 
Join Date: Jan 2007
Location: Walnut Creek, California
Posts: 2,028
The Marriott SOMA Mission Bay is looking good.

[IMG]Marriott SOMA Mission Bay by viewguysf, on Flickr[/IMG]
Reply With Quote
     
     
  #2487  
Old Posted Jun 22, 2021, 2:16 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
block 9W



Merrimac St

Reply With Quote
     
     
  #2488  
Old Posted Jun 28, 2021, 8:28 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
the work along the creek

Reply With Quote
     
     
  #2489  
Old Posted Jul 11, 2021, 2:42 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
sloooowly but surely, the work along the Creek



and at the hotel, not sure what these large concrete blocks which appear will mostly block the sidewalk are for

Reply With Quote
     
     
  #2490  
Old Posted Aug 2, 2021, 2:59 AM
homebucket homebucket is offline
A Man In Dandism
 
Join Date: Jan 2012
Location: The Bay
Posts: 8,720


Reply With Quote
     
     
  #2491  
Old Posted Aug 3, 2021, 5:16 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
^ again, nice shots.

sometimes it's hard to see the progress in the work along the Creek



but they have added dirt to the dug-out areas so maybe they are getting close to wrapping that part up



and we did finally get new sidewalks on the east side of Fourth St that runs along that area. it was one of the few sidewalk stretches that, in all the development over the years, had not been poured in its final form.



on the corner with Channel, I had hoped the open area might turn into something that would engage passers-by, like being seating for a food place or something, but it looks like a school will be going in there, and I assume that means these are the bases for some kind of fencing-off structure, which would be too bad, imo. hope I'm wrong.



I'm a bit perplexed about block 9. I think this is modular construction so should be going up quickly, but I don't see much change since the last time I was by, weeks ago



UCSF's parking garage



looks like the psychiatry center should be wrapping up soon. Third St side



18th St



looking up Tennessee



One de Haro, west side



its back area has gotten some plantings, but not sure what that is supposed to look like in its final version. I seem to remember the renderings had bluish glass divisions or something, not sure if that is still the plan


Last edited by timbad; Aug 3, 2021 at 5:23 AM. Reason: changing wording in one sentence
Reply With Quote
     
     
  #2492  
Old Posted Aug 23, 2021, 10:04 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
Quote:
Originally Posted by timbad View Post
...

and at the hotel, not sure what these large concrete blocks which appear will mostly block the sidewalk are for

well, they were removed:



looks like we will get the sidewalk back on the Third St side as well pretty soon



the hotel



I think block 9W is stalled



Weill Institute



UCSF parking garage



can't really tell in this pic, but the psychiatry center is getting some brick at ground floor level along Third, and I think it is improving the overall look



at Crane Cove Park, 'Building 49' is having some preliminary restoration work done before someone comes along and turns it into a kayak rental/maybe café



random other shots of the park







the extension of 19th St is fully open



its intersection with Illinois



it winds around and connects with 20th St




Quote:
Originally Posted by timbad View Post
sometimes it's hard to see the progress in the work along the Creek



...

on the corner with Channel, I had hoped the open area might turn into something that would engage passers-by, like being seating for a food place or something, but it looks like a school will be going in there, and I assume that means these are the bases for some kind of fencing-off structure, which would be too bad, imo. hope I'm wrong.



...
some tangible progress by the Creek, as the walk way has been partly poured



and I was not wrong about the fencing going up, sigh

Reply With Quote
     
     
  #2493  
Old Posted Sep 27, 2021, 1:35 PM
WildCowboy WildCowboy is offline
Registered User
 
Join Date: Aug 2007
Posts: 527
After starting construction on the Block 34 parking garage in April, the neighboring UCSF clinical building at 3rd and Mariposa is now officially underway.

https://www.prnewswire.com/news-rele...301383893.html
Reply With Quote
     
     
  #2494  
Old Posted Oct 2, 2021, 5:35 PM
Pedestrian's Avatar
Pedestrian Pedestrian is offline
Registered User
 
Join Date: Dec 2016
Location: San Francisco
Posts: 24,177
^^
Quote:
Construction Starts For UCSF Clinical Building At Block 34, Mission Bay, San Francisco
BY: ANDREW NELSON 5:30 AM ON OCTOBER 2, 2021

Clark Construction Group has announced that crews have started construction on the new University of California, San Francisco Clinic Building that will occupy Block 34 in San Francisco’s Mission Bay. The groundbreaking event follows the beginning of construction on a 500-car garage for UCSF in April of this year.

Stantec is responsible for the design. The structure will span 182,800 square feet of floor area. The $335.8 million development. According to Stantec, “Block 34 Clinic Building will provide an architectural identity for the UCSF East Campus that is distinct in appearance and character from the existing UCSF Mission Bay Campus.

The clinic building will rise five floors to contain an ambulatory surgery center with 14 operation rooms, an adult and secondary clinic with facilities for many specialties, an out-patient rehabilitation therapy center, and a pharmacy. The parking garage will span nine levels. The 500 parking spaces will be used by the house administrative offices for UCSF Transporation services.

The two structures are part of UCSF’s development of Block 34, at the corner of 3rd and Mariposa Street. The block has seen the recent completion of the Wayne and Gladys Valley Center for Vision. The new clinic building and parking garage are expected to open by the summer of 2024 . . . .







https://sfyimby.com/2021/10/construc...francisco.html
Reply With Quote
     
     
  #2495  
Old Posted Oct 11, 2021, 8:57 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
^^



wider shot mostly showing the parking garage work



elsewhere, block 9A has gotten un-stalled, apparently



work on the promenade along the Creek is progressing, should be done by end next year





the UCSF psychiatry center on Third at 18th St is wrapping up



18th St side



Tennessee St side



sidewalks are open. Tennessee





18th



Third

Reply With Quote
     
     
  #2496  
Old Posted Oct 24, 2021, 8:56 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
new fencing has gone up along the creek



Reply With Quote
     
     
  #2497  
Old Posted Oct 24, 2021, 9:18 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
oh, and I'll throw this one in here - the original China Basin Building has been getting a makeover recently, and part of it are these large structures, which I hadn't noticed till today

Reply With Quote
     
     
  #2498  
Old Posted Oct 26, 2021, 6:31 PM
obemearg obemearg is offline
Registered User
 
Join Date: Sep 2021
Location: San Francisco / NYC
Posts: 116
The park space / promenade is looking great! I like that the fencing matches the old drawbridges.
Reply With Quote
     
     
  #2499  
Old Posted Nov 9, 2021, 10:12 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
on a sunnier day...



Reply With Quote
     
     
  #2500  
Old Posted Feb 12, 2022, 5:19 PM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
a few days old now, but here is the promenade from the east end, still not open

Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > General Development
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 1:20 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.