Old Posted Jan 10, 2016, 4:31 PM
LouisVanDerWright LouisVanDerWright is offline
Registered User
 
Join Date: Jul 2012
Posts: 7,443
Quote:
Originally Posted by pilsenarch View Post
^Let's hope the designs aren't finalized...
I'm not saying the designs are finalized, but the massing is pretty much locked in which is all that matters when it comes to the efficiency of one program over another. They agreed to preserve certain view lines and that means they can't just make the south towe fatter to accommodate office more efficently or anything like that.
Reply With Quote
     
     
  #142  
Old Posted Jan 27, 2016, 6:38 PM
MultiModal MultiModal is offline
Registered User
 
Join Date: May 2013
Location: Chicago
Posts: 157
Quote:
Originally Posted by LouisVanDerWright View Post
I'm not saying the designs are finalized, but the massing is pretty much locked in which is all that matters when it comes to the efficiency of one program over another. They agreed to preserve certain view lines and that means they can't just make the south towe fatter to accommodate office more efficently or anything like that.
I heard from someone at Hines today that they expect delivery on the South Tower in 2020/2021. His words were they didn't want to start too soon to River Point so they did not compete with each other. Also, he mentioned he was told that the renderings are not placeholders and should stay the same with only minor design changes.
Reply With Quote
     
     
  #143  
Old Posted Jan 27, 2016, 6:43 PM
Steely Dan's Avatar
Steely Dan Steely Dan is offline
devout Pizzatarian
 
Join Date: Jul 2001
Location: Lincoln Square, Chicago
Posts: 29,634
^ thanks for the update!
__________________
"Missing middle" housing can be a great middle ground for many middle class families.
Reply With Quote
     
     
  #144  
Old Posted Jan 27, 2016, 8:51 PM
Domer2019 Domer2019 is offline
Biased in a good way?
 
Join Date: Apr 2015
Location: Chicagoland
Posts: 264
Quote:
Originally Posted by MultiModal View Post
I heard from someone at Hines today that they expect delivery on the South Tower in 2020/2021. His words were they didn't want to start too soon to River Point so they did not compete with each other. Also, he mentioned he was told that the renderings are not placeholders and should stay the same with only minor design changes.
Delivery as in following through with their plans, or completion?
Reply With Quote
     
     
  #145  
Old Posted Jan 27, 2016, 9:05 PM
Steely Dan's Avatar
Steely Dan Steely Dan is offline
devout Pizzatarian
 
Join Date: Jul 2001
Location: Lincoln Square, Chicago
Posts: 29,634
Quote:
Originally Posted by Domer2019 View Post
Delivery as in following through with their plans, or completion?
in the development world, "delivery" usually refers to completion, as in delivery of the product (condos, apartments, office space, etc.) to the marketplace.

if they hold to that timeline, shovels would most likely go in the ground sometime in 2018.
__________________
"Missing middle" housing can be a great middle ground for many middle class families.
Reply With Quote
     
     
  #146  
Old Posted Jan 28, 2016, 1:45 PM
pilsenarch pilsenarch is offline
Registered User
 
Join Date: Dec 2006
Posts: 886
Quote:
Originally Posted by MultiModal View Post
I heard from someone at Hines today that they expect delivery on the South Tower in 2020/2021. His words were they didn't want to start too soon to River Point so they did not compete with each other. Also, he mentioned he was told that the renderings are not placeholders and should stay the same with only minor design changes.
Well, I'm still praying they change... the Pelli designs remind me of something built in, like, Minneapolis in the '90s...
Reply With Quote
     
     
  #147  
Old Posted Jan 29, 2016, 2:31 AM
spyguy's Avatar
spyguy spyguy is offline
THAT Guy
 
Join Date: Oct 2005
Posts: 5,949
Since WPW is now in the "completed" section, here's that plus the remainder of the site:
20160123-_DSF9523 by Jeffrey Wang, on Flickr

Last edited by spyguy; Jan 29, 2016 at 2:47 AM.
Reply With Quote
     
     
  #148  
Old Posted Feb 1, 2016, 3:49 PM
SamInTheLoop SamInTheLoop is offline
you know where I'll be
 
Join Date: Sep 2006
Posts: 5,543
Quote:
Originally Posted by LouisVanDerWright View Post
I'm not saying the designs are finalized, but the massing is pretty much locked in which is all that matters when it comes to the efficiency of one program over another. They agreed to preserve certain view lines and that means they can't just make the south towe fatter to accommodate office more efficently or anything like that.


I've almost completely missed the floorplate size differential between s and e towers in my previous multiple attempts to explain why office in the s tower is unlikely. But, this is even a more compelling reason probably.

The e tower is perfectly suited for a single use office tower...right massing, right floorplate, right height, situated right within the overall wp footprint....on and on.....while the s tower works better as a resi/hotel combo.........
__________________
It's simple, really - try not to design or build trash.
Reply With Quote
     
     
  #149  
Old Posted Feb 9, 2016, 4:56 AM
jsbrook jsbrook is offline
Registered User
 
Join Date: Aug 2014
Location: Bala Cynwyd
Posts: 3,658
Quote:
Originally Posted by MultiModal View Post
I heard from someone at Hines today that they expect delivery on the South Tower in 2020/2021. His words were they didn't want to start too soon to River Point so they did not compete with each other. Also, he mentioned he was told that the renderings are not placeholders and should stay the same with only minor design changes.
How about the East Tower? West Tower turned out to be a stunner!
Reply With Quote
     
     
  #150  
Old Posted Feb 9, 2016, 2:02 PM
Skyguy_7 Skyguy_7 is offline
BANNED
 
Join Date: Dec 2012
Location: Chicago
Posts: 2,657
Quote:
Originally Posted by SamInTheLoop View Post
...snip...

The e tower is perfectly suited for a single use office tower...right massing, right floorplate, right height, situated right within the overall wp footprint....on and on.....while the s tower works better as a resi/hotel combo.........
Sam, what you're saying makes sense, as far as the South tower being resi/hotel, but what do you make of Hines' concern about this tower "competing" with River Point, which would imply it's going to be at least partially office.

Imagine, office within the first 700' and then hotel after the setback above. Dear Tower Gods, just this one time, please let hotel on the upper-floors be profitable.
Reply With Quote
     
     
  #151  
Old Posted Mar 23, 2016, 4:23 AM
J_M_Tungsten's Avatar
J_M_Tungsten J_M_Tungsten is offline
Registered User
 
Join Date: May 2009
Location: Chicago
Posts: 3,379
I wanted to see what Wolf Point looked like from my shot in the River Point page (looking west down the river). Height may not be perfect, but the yet to be built Wolf Point buildings will make a dramatic impact on that view.
Reply With Quote
     
     
  #152  
Old Posted Mar 23, 2016, 7:21 PM
Zapatan's Avatar
Zapatan Zapatan is offline
DENNAB
 
Join Date: Aug 2009
Location: NA - Europe
Posts: 6,042
Looks cool! Should be quite a bit taller though
Reply With Quote
     
     
  #153  
Old Posted Mar 23, 2016, 7:26 PM
Kumdogmillionaire's Avatar
Kumdogmillionaire Kumdogmillionaire is offline
Development Shill
 
Join Date: Nov 2015
Location: San Antonio
Posts: 1,136
I thought the new design had a spire, also it's a bit taller than that, should look a lot bigger than River Point. Still cool to see the potential future view
__________________
For you - Bane
Reply With Quote
     
     
  #154  
Old Posted Apr 6, 2016, 4:49 PM
k1052 k1052 is offline
Registered User
 
Join Date: Oct 2007
Posts: 2,235
Just walked by on my way to lunch and saw a soil testing rig working the east side of the site.
Reply With Quote
     
     
  #155  
Old Posted Apr 6, 2016, 5:35 PM
simon07 simon07 is offline
Registered User
 
Join Date: Jan 2012
Posts: 92
Looking at that photo and seeing the gap between river point and wolf point south, I can only imagine how valuable that parking lot across the street on canal from river point now is. The value must have skyrocketed since all of this was announced, I think they could not have imagined in their wildest dreams that nothing would block their view east down the river...WOW
Reply With Quote
     
     
  #156  
Old Posted Apr 6, 2016, 5:43 PM
scalziand's Avatar
scalziand scalziand is offline
Mortaaaaaaaaar!
 
Join Date: Aug 2007
Location: Naugatuck, CT/Worcester,MA
Posts: 3,506
Yeah, wasn't the River Point hotel tower originally supposed to block that view?
Reply With Quote
     
     
  #157  
Old Posted Apr 6, 2016, 5:53 PM
simon07 simon07 is offline
Registered User
 
Join Date: Jan 2012
Posts: 92
Quote:
Originally Posted by scalziand View Post
Yeah, wasn't the River Point hotel tower originally supposed to block that view?
Originally yes....but then it was scrapped by the alderman if my memory is correct and Gibsons is now going into a small two story structure on the site....Jackpot.
Reply With Quote
     
     
  #158  
Old Posted Apr 7, 2016, 12:37 AM
BuildThemTaller BuildThemTaller is offline
Registered User
 
Join Date: Oct 2014
Location: Long Island City, NY
Posts: 1,012
Quote:
Originally Posted by k1052 View Post
Just walked by on my way to lunch and saw a soil testing rig working the east side of the site.
Walked by on my way to the Brown Line at Merchandise Mart this evening after work. The soil testing rig was positioned on the south side of the lot. It was a little muddy, but it looked like it was busy on the east side, too. Might this mean both towers could go up at the same time?
Reply With Quote
     
     
  #159  
Old Posted Apr 7, 2016, 1:08 AM
LouisVanDerWright LouisVanDerWright is offline
Registered User
 
Join Date: Jul 2012
Posts: 7,443
^^^ It probably just means they wanted to save money by doing the soil testing simultaneously. I can't see them building both at once if only because the option of having an enormous staging area when building a 1,000' is a huge plus. Either way it's exciting that they are moving on soil testing, usually indicates forward momentum for a project.
Reply With Quote
     
     
  #160  
Old Posted Apr 10, 2016, 9:24 PM
LouisVanDerWright LouisVanDerWright is offline
Registered User
 
Join Date: Jul 2012
Posts: 7,443
No one got pictures of the soil testing rigs? I'd love to have seen where they were drilling.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > Skyscraper & Highrise Construction
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 8:54 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.