Have now started forming and pouring 28th floor walls and posts. Finally moved the tower crane hydraulic lift section up and have now delivered three more sections of the tower onsite. Final 3 section lift should be happen in the next few days.
Reply With Quote
     
     
  #282  
Old Posted May 12, 2023, 8:19 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
The final tower crane lift for this York 31s building happened today.
Reply With Quote
     
     
  #283  
Old Posted Jun 11, 2023, 1:19 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
Forming for the 29th floor walls well under way now. They have also started the exterior concrete paint finishing.
Reply With Quote
     
     
  #284  
Old Posted Jun 23, 2023, 4:42 PM
Changerang Changerang is offline
Registered User
 
Join Date: May 2023
Posts: 2
Seems they have started the 30th floor now.
Reply With Quote
     
     
  #285  
Old Posted Jul 6, 2023, 4:28 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
Forming of the 30th floor walls and posts continues. They have made good progress installing the glass wall facing King St which is the main lobby entrance.
Reply With Quote
     
     
  #286  
Old Posted Aug 1, 2023, 12:31 PM
mcalpinestudios's Avatar
mcalpinestudios mcalpinestudios is offline
Registered User
 
Join Date: Nov 2017
Posts: 22
Progress as of July 29th, 2023

__________________
Curator of @519London
McAlpine Studios Inc.
Reply With Quote
     
     
  #287  
Old Posted Aug 18, 2023, 12:43 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
Slowly progressing with forming and pouring the 31st floor walls and posts. Must be alot of custom forming required for this final residential floor level.
Reply With Quote
     
     
  #288  
Old Posted Aug 27, 2023, 1:03 AM
Goldenamishplumber Goldenamishplumber is offline
Registered User
 
Join Date: May 2021
Posts: 43
This shot is from a few weeks ago, but its a different view than normal! you can see 195 dundas in the background as well
Reply With Quote
     
     
  #289  
Old Posted Sep 11, 2023, 2:34 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
They have now removed the concrete pump boom from the top and the pump machine on the ground on the south side. Will now use a concrete bucket for the remaining pours.

Last edited by jammer139; Sep 12, 2023 at 11:43 AM.
Reply With Quote
     
     
  #290  
Old Posted Sep 16, 2023, 5:36 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
York website for this building.


https://www.aquionking.ca/


2 bedrooms will be $2395/mth plus $100/mth for a parking spot.
Londons first outdoor rooftop infinity pool 32s up.



Will be interesting to see the vacancy rate of these units at these prices.


Ayerswood 25s Dundas St building a block away will also be renting units and the demand for those will also be worth watching.


Old Oaks 40s Centro tower and Drewlos 16s Talbot St building as well as the 13s at Talbot and St. James and Medallions 19s and 23s towers on South will also be competing for tenants in 2024.



Will the market be there?

Last edited by jammer139; Sep 16, 2023 at 5:47 PM.
Reply With Quote
     
     
  #291  
Old Posted Sep 16, 2023, 7:12 PM
GreatTallNorth2 GreatTallNorth2 is offline
Registered User
 
Join Date: May 2006
Posts: 1,452
Quote:
Originally Posted by jammer139 View Post
York website for this building.


https://www.aquionking.ca/


2 bedrooms will be $2395/mth plus $100/mth for a parking spot.
Londons first outdoor rooftop infinity pool 32s up.



Will be interesting to see the vacancy rate of these units at these prices.


Ayerswood 25s Dundas St building a block away will also be renting units and the demand for those will also be worth watching.


Old Oaks 40s Centro tower and Drewlos 16s Talbot St building as well as the 13s at Talbot and St. James and Medallions 19s and 23s towers on South will also be competing for tenants in 2024.



Will the market be there?
Yes, the market is across the street.
Reply With Quote
     
     
  #292  
Old Posted Oct 3, 2023, 3:18 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
Forming well under way now for the mechanical penthouse and rooftop features. Also making progress with exterior concrete painting on the east side of building. They will likely pick up the pace on exterior concrete finishing to get as much done before freezing temps arrive.
Reply With Quote
     
     
  #293  
Old Posted Oct 6, 2023, 1:47 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
York has now opened the leasing office in the ground floor lobby entrance off King St. Occupancy is expected by Feb 2024.


Some of the rooftop mechanical walls are now poured. Likely having the top-out ceremony within a week or two.
Reply With Quote
     
     
  #294  
Old Posted Oct 6, 2023, 10:54 PM
ssiguy ssiguy is offline
Registered User
 
Join Date: Mar 2006
Location: White Rock BC
Posts: 10,714
Considering the downtown location, the huge size of the units, the views, and the amenities. and the fact it's a new building, those are pretty good prices. Here i n Vancouver's downtown such suites would be well over $6000/month or for the same price you would get a 450 square foot basement apt in a 60 year old building but only if you were VERY lucky and certainly nowhere close to downtown.
Reply With Quote
     
     
  #295  
Old Posted Dec 29, 2023, 7:12 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
They have now installed the driveway curbing and a base coat of asphalt on the York Street entrance side of this building. Still alot of concrete finishing and painting to complete for the exterior. Have also started installing the glass walls for the 2 level amenity space up at the 23-24 floor NE corner.
Reply With Quote
     
     
  #296  
Old Posted Jan 19, 2024, 8:16 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
Milestone day for York Dev with Ellis Don starting the process of removing and trucking away the tower crane using a tall mobile crane and smaller mobile crane to load the flatbed trailers with the parts. Using the Landlords parking lot as staging area for disassembly.
Reply With Quote
     
     
  #297  
Old Posted Apr 16, 2024, 7:58 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
First tenants have moved in now using the 6th thru 10th floors. Still have the north and west walls to complete concrete finishing and paint on the exterior.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 11:50 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.