Quote:
Originally Posted by ITB495
How many floors still to go? When is it expected to top off?
|
The next floors to rise will be:
170.5 foot steel crown
1,257.5 (roof)
45.6 foot void for the tuned mass damper (the last concrete setback will be at 1,226.5)
1,211 (currently)
The floor it's currently on is taking a while because the mass damper is going up, I expect concrete to top out in late March maybe