View Poll Results: Which design would you like to see built?
Allied Works with BKDI 14 10.00%
SPF 76 54.29%
Ateliers Jean Nouvel Workshop 21 15.00%
Saucier + Perrotte with GEC 14 10.00%
Diller Scofidio + Renfro with Kasian 15 10.71%
Voters: 140. You may not vote on this poll

Reply

 
Thread Tools Display Modes
     
     
  #381  
Old Posted Aug 29, 2012, 10:46 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
Quote:
Originally Posted by Calgarian View Post
Is this thing ever going to happen?
shovels in ground in October is last I heard. Phase 1 is fully funded, which includes the entire building envelope and finishing the first couple floors of the interior.
Reply With Quote
     
     
  #382  
Old Posted Aug 29, 2012, 11:20 PM
Calgarian's Avatar
Calgarian Calgarian is offline
Registered User
 
Join Date: Jun 2006
Location: Calgary, AB
Posts: 24,092
Is phase 1 the new building or the King Eddy side?
__________________
Git'er done!
Reply With Quote
     
     
  #383  
Old Posted Aug 30, 2012, 5:30 AM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
Quote:
Originally Posted by Calgarian View Post
Is phase 1 the new building or the King Eddy side?
Both sides.
Reply With Quote
     
     
  #384  
Old Posted Aug 30, 2012, 9:21 PM
Calgarian's Avatar
Calgarian Calgarian is offline
Registered User
 
Join Date: Jun 2006
Location: Calgary, AB
Posts: 24,092
So what's phase 2?
__________________
Git'er done!
Reply With Quote
     
     
  #385  
Old Posted Aug 30, 2012, 9:23 PM
kw5150's Avatar
kw5150 kw5150 is offline
Here and There
 
Join Date: Nov 2009
Location: Calgary
Posts: 5,807
Quote:
Originally Posted by Calgarian View Post
So what's phase 2?
Finishing the rest of the inside!
__________________
Renfrew, Calgary, Alberta.
Reply With Quote
     
     
  #386  
Old Posted Aug 30, 2012, 9:27 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
Quote:
Originally Posted by kw5150 View Post
Finishing the rest of the inside!
Yup. hopefully money can be raised in the interim to continue with phase 2 at the same time as phase 1. There's probably a good chance of that happening. Donors often step up once construction is underway. It's less likely that they give money to a project that never happens that way.
Reply With Quote
     
     
  #387  
Old Posted Sep 1, 2012, 12:02 AM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,191
I'm pretty happy about the phasing, since it sounds like even if phase 2 fell through you'd have a fully restored (on the outside) King Eddy and a new building, which to me would mean no matter what the end result, but would remain, look good, and be used for SOMETHING.
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
Reply With Quote
     
     
  #388  
Old Posted Oct 11, 2012, 1:09 AM
Deepstar's Avatar
Deepstar Deepstar is offline
Registered User
 
Join Date: Mar 2007
Location: Canada
Posts: 6,291
Quote:
Originally Posted by You Need A Thneed View Post
shovels in ground in October is last I heard. Phase 1 is fully funded, which includes the entire building envelope and finishing the first couple floors of the interior.
I'd kill to see this one start construction.
Reply With Quote
     
     
  #389  
Old Posted Oct 11, 2012, 2:32 AM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
I tweeted the National Music Centre, they said start is now q1, 2013.
Reply With Quote
     
     
  #390  
Old Posted Oct 11, 2012, 3:02 AM
Bigtime's Avatar
Bigtime Bigtime is offline
Very tall. Such Scrape.
 
Join Date: Jun 2005
Posts: 17,731
Quote:
Originally Posted by You Need A Thneed View Post
I tweeted the National Music Centre, they said start is now q1, 2013.
The continuous pushing back is starting to get me concerned.
Reply With Quote
     
     
  #391  
Old Posted Oct 11, 2012, 3:53 AM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
Quote:
Originally Posted by Bigtime View Post
The continuous pushing back is starting to get me concerned.
It is a little concerning, but considering that they have the funds for the first phase, I really believe that it will go ahead.

Perhaps it is something as simple as it being cheaper to excavate during the spring, rather than fall/winter.
Reply With Quote
     
     
  #392  
Old Posted Oct 11, 2012, 4:40 AM
Wooster's Avatar
Wooster Wooster is offline
Round Head
 
Join Date: Nov 2003
Posts: 12,688
I think there a couple planning issues to be resolved. Shouldn't be anything to worry about.
Reply With Quote
     
     
  #393  
Old Posted Oct 11, 2012, 4:31 PM
Calgarian's Avatar
Calgarian Calgarian is offline
Registered User
 
Join Date: Jun 2006
Location: Calgary, AB
Posts: 24,092
Do they have a BP in currently?
__________________
Git'er done!
Reply With Quote
     
     
  #394  
Old Posted Oct 11, 2012, 5:15 PM
Surrealplaces's Avatar
Surrealplaces Surrealplaces is offline
Editor
 
Join Date: Feb 2006
Location: Cowtropolis
Posts: 19,968
It's pretty common for any developments to get pushed back. I hope the current building boom in Calgary doesn't affect construction start.
Reply With Quote
     
     
  #395  
Old Posted Oct 11, 2012, 6:30 PM
suburbia suburbia is offline
BANNED
 
Join Date: Mar 2012
Posts: 6,271
Quote:
Originally Posted by Surrealplaces View Post
It's pretty common for any developments to get pushed back.
BUT "any development" isn't a good touchstone for a non-profit. Perhaps a better one would be the polar bear exhibit at the Calgary Zoo that will be opening soon.

Okay, perhaps I'm being too negative, but point is, revenue streams for a non-profit don't accordion like those for many for profit buildings. Construction costs go up means condo prices go up, balancing revenue and expenditure those types of projects. Different ball game.
Reply With Quote
     
     
  #396  
Old Posted Oct 11, 2012, 7:20 PM
MichaelS's Avatar
MichaelS MichaelS is offline
Registered User
 
Join Date: Jan 2006
Location: Calgary
Posts: 2,402
Quote:
Originally Posted by Calgarian View Post
Do they have a BP in currently?
Not yet.
Reply With Quote
     
     
  #397  
Old Posted Mar 26, 2013, 8:38 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
Gotye in residence at National Music Centre.

This is the kind of publicity that is great for the place.
Reply With Quote
     
     
  #398  
Old Posted Mar 26, 2013, 9:17 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,447
That is pretty cool - neat that it isn't even something formal.
Reply With Quote
     
     
  #399  
Old Posted Apr 17, 2013, 8:17 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
Reply With Quote
     
     
  #400  
Old Posted Apr 17, 2013, 8:20 PM
kw5150's Avatar
kw5150 kw5150 is offline
Here and There
 
Join Date: Nov 2009
Location: Calgary
Posts: 5,807
Yaaaaaaaaayyyyyyyyyyyyyyyyy!!!

Can wait to be going through the under pass on 4th and then uphill under and through the national music centre!!!!
__________________
Renfrew, Calgary, Alberta.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 4:34 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.