Quote:
Originally Posted by maccoinnich
Revised drawings [40 MB] and memo. Looks like they're giving up that pretense that they would ever build the second phase on the Office Max site.
|
Quote:
Originally Posted by maccoinnich
|
So they are moving forward on the North half of the block as well now?