HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted May 23, 2023, 7:43 PM
mcj mcj is online now
Registered User
 
Join Date: Dec 2021
Location: New West
Posts: 1,156
Quote:
Originally Posted by FarmerHaight View Post
Also remember that Brentwood has a rail connection to all of the Tri-Cities and SoF (albeit, with some annoying transfers from Expo to Millennium).
I do know it is part of the plans for the Broadway Extension to bring the Production Way leg all the way back through Brentwood (terminus at Arbutus). However until that happens there isn't a great connection. If you're coming from SoF you've got to connect at Columbia, then Production-Way (or Lougheed) then again at Brentwood. 3 connections versus 1 when you can just take the Expo to Waterfront and get on the Seabus or 1 when you can take the Expo to Metrotown and then connect there.

I think it would be annoying to the point of uselessness. I get the need to bring transit across the IWB, but in theory we need to plan a new bridge for that, whereas the Metrotown to PNE leg we don't need a new bridge.

Phasing will likely have cost drawbacks as you're doubling up on many costs, and when the total pricetag for this project will likely approach $10B+ (especially with a new road bridge included), doing it as one megaproject could have cost savings in the billions versus chopping it up into phases.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 10:16 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.