HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #1  
Old Posted Apr 13, 2023, 4:36 PM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888
Highway 7 Widening - 266th St. to 287th St. | U/C

Lougheed Highway 7 Widening - 266th St. to 287th St. Project between Maple Ridge & Mission:

Status: Construction underway. "Schedule: Project completion expected in fall 2024."

BC Gov Project Home Page:
Link

When completed, Highway 7 will be widened to four lanes between 266th and 287th streets to address traffic congestion. Centre median barriers will improve safety, with barriers also added to the existing four-lane highway from west of Spilsbury Road to 266th Street.

“This project will widen the last two-lane stretch of Highway 7 between the Haney Bypass in Maple Ridge and Mission to four lanes,” said Bob D’Eith, MLA for Maple Ridge-Mission.

Maple Ridge-Pitt Meadows News : Construction begins Monday to widen Lougheed Highway between Mission and Maple Ridge
DILLON WHITE Feb. 2, 2023 2:16 p.m Link

The Ministry of Transportation and Infrastructure will commence work on Monday (Feb. 6) to widen a four-kilometer stretch of Lougheed Highway (Highway 7) between 266th Street and 287th Street in Maple Ridge. The project will expand the highway from two lanes to four lanes.


Source: Design Update 2022 PDF on project web page (url above)


Source: https://news.gov.bc.ca/releases/2022TRAN0118-001718
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 2:20 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.