So the London landfill is expected to be full by 2025.
https://getinvolved.london.ca/WhyWasteDisposal
Options include expanding it to hopefully get us to 2050. The EA process needs to start now in order to get that approved in time.
Another option is to truck our waste to another landfill.
Where should London buy a 1000 plus acres of land to prepare for our future landfill after 2050? Any ideas other then in the GTA?