Posted Sep 1, 2015, 7:29 PM
|
|
Moderator
|
|
Join Date: Jan 2009
Location: Portland
Posts: 8,080
|
|
Notice of a Type II Proposal [PDF] which will at least partially close the Springwater Corridor Sellwood gap:
Quote:
Portland Parks and Recreation proposes construction of a 12- to16-ft wide paved trail segment along the Springwater Trail between SE Umatilla Street and SE Ochoco Street. Approximately 880 feet of the trail, between SE Umatilla and SE Clatsop, lie within the Greenway overlay zone. Only this portion of the trail construction, therefore, is subject to Greenway Review.
The area of the proposed trail is currently an informal gravel or bare dirt trail adjacent to the railroad tracks. No trees will be impacted by the paving, and all disturbed vegetative areas will be seeded with a native grass mixture upon completion of the paved trail construction.
A previous land use case (LU 08-147820-GW) approved a sewer interceptor and trail improvements. However, the trail improvements were not accomplished during the three-year permit limits. This proposal will complete the plans included in this former land use case.
|
|