Quote:
Originally Posted by go_leafs_go02
I like that for the most part. Pretty good design, not too complicated either.
Only thing I would change is to have the 70A Avenue connection instead connect down 232 Street. Alot of traffic uses 232 Street so it should be connected through with an intersection.
|
You make an interesting point, but unfortunately because of the creek location in that area, connecting 232 street with that intersection would be much more complicated, perhaps not even doable. 232 Street would connect where it currently does under this plan with no change.
Quote:
Originally Posted by go_leafs_go02
Oh, and another collision there today EB right at the merge point. Traffic back to 200 Street. Yet the MOT says they need warrants to do any upgrades. An accident every other week or so says nothing?
Why this wasn't included in Gateway is beyond me...
|
There seems to be less attention paid to things like these. You should make the MOT aware of that in another e-mail. You are a frequent driver of the area, I'm sure they will listen.