HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Suburban Ottawa


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Jun 11, 2010, 1:38 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,663
I was thinking that instead of running the LRT to the airport, with this facility going in maybe a smaller scale version of Toronto's Pearson Airport LINK train would make better sense. It could run from the airport, stop at this expo centre and the hotel then continue to a new LRT station at Lester road or to even to South Keys. The Pearson set-up cost only $55 million, I imagine something smaller would be less, maybe just one track with one train going back and forth which could still provide 10 minute service over a 2 km route. The thing is cable driven, super quiet and cheap to run.

Video Link
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Suburban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 9:57 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.