Posted Jun 16, 2008, 12:42 PM
|
|
Registered User
|
|
Join Date: Jun 2008
Posts: 5
|
|
Regarding using the existing rail between Tigard / Tualatin through Lk Oswego for future commuter projects - I've talked with P&W officials, and they were not shy about not allowing that to happen. The conversation was essentially "Not just no, but he!! no." However, I've seen the same possibility for a long time, and think that joining WES to the Willamette Trolley line in LO so that people have a direct shot at downtown without a transfer at the Beaverton TC makes too much sense.
|