HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #1  
Old Posted Nov 7, 2007, 4:27 AM
fireicedog fireicedog is offline
Registered User
 
Join Date: Feb 2003
Posts: 179
eco-cite on the canal | 5 fl | u/c

I was taking the 1 from billings the other day and noticed this green project was finally u/c with a operational crane up. There are construction pics on it's site.
http://www.ecocite.com/onthecanal/Canal_updates.html
BTW, strange looking crane.


Also the infill on south bank (south of sunnyside) across from the 7/11 has been completed, around 5 stories, with ground retail.

Finally the G looks to be under construction as well on bank.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 12:12 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.