Quote:
|
Forgive me for questioning a Delcan report, but wouldn't a few sidings to let the oncoming train by negate much of the "blackout" time caused by via trains?
|
We have to remember that the intent of this route was to provide either a faster route into the city from Barrhaven or to provide a temporary replacement while the Transitway was being converted. The Via route fails on both accounts. There are repeated references to expected headways of 10 minutes or better, which cannot be achieved with 14 Via Rail trains on the same track, and some of them running during peak periods. The report does talk about the issues surrounding mixing trains and intermediate sidings.
Quote:
|
And that's where they could start a bigger network. It's evident that people look for the shorter route, and not only for the lack of transfer (where they will anyways with the LRT).
|
No, people look for the fastest route. With Via Rail's on time performance, people will quickly learn that the Via Rail route could entail significant possibilities of delays, which will send them flooding to the more reliable route, the Transitway.
You know, anything is pretty much possible, if we are willing to pay for it. The report talks about parallel track but also the costs of doing this. It seems to me that we are just trying to find excuses for not using the right of way that the city already owns and to not use the bridge that has to be built anyways.