  #61  
Old Posted Apr 12, 2020, 4:06 PM
GFORCE GFORCE is offline
Registered User
 
Join Date: Apr 2020
Posts: 1
Talbot st Drewlo apts16s

Heavy equipment onsite
Reply With Quote
     
     
  #62  
Old Posted Apr 13, 2020, 2:01 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
Just so you know there is a thread for 661 Talbot St

https://skyscraperpage.com/forum/sho...d.php?t=224372




Quote:
Originally Posted by GFORCE View Post
Heavy equipment onsite
Reply With Quote
     
     
  #63  
Old Posted Jun 10, 2020, 11:55 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
Now working on exterior brick on east side of buildings. Lots of interior work going on with drywall and cabinet installations.
Reply With Quote
     
     
  #64  
Old Posted Jul 5, 2020, 11:14 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
Good progress on exterior brick work. Should be wrapping that up within the next 2 weeks.
Reply With Quote
     
     
  #65  
Old Posted Aug 14, 2020, 8:30 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
Sidewalk has now been poured along Richmond St fronting the buildings.
Reply With Quote
     
     
  #66  
Old Posted Aug 29, 2020, 1:01 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
Paved the driveway and parking lot now. Landscaping work starting. Still looks like interior finishing work is underway. First tenants are likely by Oct.
Reply With Quote
     
     
  #67  
Old Posted Sep 10, 2020, 12:20 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
The north building already has tenants now.
Reply With Quote
     
     
  #68  
Old Posted Sep 22, 2020, 3:02 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
They started installing the black stone trim on bottom floors. Must have been a delay for this because they now have to work around the landscaping and sod that was installed a couple of weeks ago. Oops!
Reply With Quote
     
     
  #69  
Old Posted Dec 4, 2020, 7:14 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
Only now finishing the black stone installs. Final trim pieces left and this project is essentially done.
Reply With Quote
     
     
  #70  
Old Posted Sep 25, 2021, 2:15 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
Looks like they are redoing the black stone exterior on the north building again. The stone has been removed along the ground floor fronting Richmond street. Expensive redo I suspect.
Reply With Quote
     
     
  #71  
Old Posted Jul 24, 2022, 4:38 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
Interesting to see that they have still not fixed the black stone exterior installation on the buildings. Still showing large gaps between the stone slabs and exposed insulation. Wonder if this is now tied up in lawsuits or the developer has dropped the ball in getting this work properly done.
Reply With Quote
     
     
  #72  
Old Posted May 10, 2023, 4:00 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
Another year has come and gone and the huge gaps in the black stone work showing exposed insulation is still not fixed. With that level of attention to detail I'd suspect there are many other quality problems with this rental building.
Reply With Quote
     
     
  #73  
Old Posted Sep 25, 2023, 11:36 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,764
The developer website for this project. Aventus Developments




https://aventusdevelopments.com/projects/


1635 Masonville Yards







The high demand for the Luxe lifestyle has been a strategic catalyst for a launch of a second building in the booming city of London. Situated directly across from the largest shopping mall, and just minutes from the downtown core and Western University, 1635 Richmond spans 7 stories and 392 suites. With its modern exterior and upgraded features and finishes, 1635 does not disappoint."


https://www.masonvilleyards.com/


Made me laugh reading the description of this modern exterior. They still have huge gaps between the exterior stone slabs with visible spray foam. It's been a couple of years since these buildings were finished and they have not fixed the stonework yet?
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 1:04 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.