Quote:
Originally Posted by Briguy
Glazing been super slow everywhere due to supply chain. Recall these top floors had heights changed late. 900 Randolph hasent even started glazing either.
|
Yeah, this makes total sense now that you mention it. I walked by 900 the other day and wondered where the glass was at myself. When I bought my condo back in Feb., there was an unfinished interior glass plane that needed to be installed, and it was on back order for so damn long.