View Single Post
  #2399  
Old Posted Jul 14, 2022, 3:54 PM
twister244 twister244 is offline
Registered User
 
Join Date: Aug 2016
Location: Chicago
Posts: 3,893
Quote:
Originally Posted by Briguy View Post
Glazing been super slow everywhere due to supply chain. Recall these top floors had heights changed late. 900 Randolph hasent even started glazing either.
Yeah, this makes total sense now that you mention it. I walked by 900 the other day and wondered where the glass was at myself. When I bought my condo back in Feb., there was an unfinished interior glass plane that needed to be installed, and it was on back order for so damn long.