Posted Nov 23, 2020, 6:32 AM
|
Registered User
|
|
Join Date: Jun 2006
Posts: 164
|
|
Based on what I could see when I walked up there on Friday, looks like that mound of dirt that they are driving the mixer trucks and concrete pump on will have to be taken out of there because that area is needed for the lower level of the building.
How will they get stuff to the site without that opening that's under WPE?
|