View Single Post
  #7479  
Old Posted Jul 6, 2022, 5:35 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,788
Quote:
Originally Posted by cllew View Post
On Facebook there has been some chatter about the multi family residential development that is (was) going up on Kimberly Ave behind Immanuel United Church.

Apparently 311 has been telling callers that there is now a stop work order because the contractor does not the right permits to continue. That also means that the 2 pavement cuts for the sewer connections by the fire station may be there for a while longer until things get sorted out.
^I saw that. It's been sitting at the piling stage for a few months now. I assume they had foundation permits and nothing for the building itself.


Down the street at London. The big fire site. They ripped out all the old foundation and the site has been sitting like that for a while now. I think this might have been mentioned previously.

Are people living in the condos that were damaged? Seems empty in there. That is a long time and a lot of people to be put out.
Reply With Quote