Okay, in going through and researching old threads, I have some minor updates on this one:
ZP-2021-004092
Quote:
ZONING PERMIT (ZONING)
Type of work
NEW CONSTRUCTION, ADDITION, GFA CHANGE
FOR THE ERECTION OF AN ADDITON TO THE EXISTING SEMI-DETACHED STRUCTURE. SIZE AND LOCATION AS SHOWN IN APPLICATION/PLANS.
|
https://li.phila.gov/Property-Histor...ZP-2021-004092
SP-2021-000354
Quote:
FOUNDATION AND EXCAVATION
FOR SITE AND FOUNDATION WORK ONLY, WORK TO INCLUDE EXCAVATION AND INSTALLATION OF DRILLED PIERS AS SHOWN PER APPROVED PLANS AND DOCUMENTATION. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER FOUNDATION AND CONSTRUCTION WORK. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
|
https://li.phila.gov/Property-Histor...SP-2021-000354
CP-2021-005917
Quote:
ADDITION AND/OR ALTERATION
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) TO AN EXISTING STRUCTURE. ALTERATION TO INCLUDE THE DEMOLITION AND RECONSTRUCTION OF PARTITION WALLS. WORK TO BE PERFORMED AS PER APPROVED PLANS.**IEBC 2018
**SEPARATE PERMITS REQUIRED FOR ANY MECHANICAL,ELECTRICAL,PLUMBING OR FIRE SUPPRESSION WORK**
|
https://li.phila.gov/Property-Histor...CP-2021-005917
So... site work imminent?