speaking of the mental health facility...
looking west up 18th St toward Third
corner with Third (streetcars officially back this weekend)
corner with Tennessee
jumping over to the new UCSF buildings' site, looking NE from Third and Mariposa, at what will be the parking garage
more straight on down Third
the garage portion has indeed been started
for now the parking lot is intact where the clinical building will be. here looking south at the portion of the drive-up crescent on the east side that was put in as part of the Valley medical building, (the crescent) which will have a corresponding southern half once the new building is in place
from the Third St side
and the current state of the paseo. the new building will frame it on the right
over to block 9A, seen from the south (China Basin St) side
and from the north (Mission Rock St) side, looking east
mock-up of a building section
jumping around now...
the southern face of the residential portion of MB, now that block 6W is filled in. (
Stagecoach Greens in the foreground)
the metallic sculpture in the Uber greenspace is complete now
'traction power facility' below the freeway under construction as part of the
electrification of the Caltrain line
not exactly MB, but close by, the one at 17th and Arkansas in Potrero Flats
another look at the Muni stop at 4th and Brannan.
490 Brannan really needs to happen - sort of unbelievable that this site has been left almost blank for this long
... and Mission Creek, with glimpses of the work being done on the south bank, on the left. this weekend there were people sitting out on the creekside patio of the brewpub on the corner with Third, which was nice to see