http://observer.com/2015/08/terminal...portation-hub/

The Authority should scale back its ambitions for a new bus station and use the far more efficient PATH network, a suggestion that’s been made by PA Vice Chairman Scott Rechler, a top real estate developer. He envisions a cheap, swift alternative: have buses connect to PATH trains in New Jersey, rather than cram them through the bottleneck of the Lincoln Tunnel. Better signaling systems, longer rush hours and longer trains would make up the difference. (The PA is already spending more than $300 million for new signals to move 50,000 more commuters a day, and is lengthening platforms to accommodate longer trains).

That could actually shrink demand for bus travel to the point where the PA would only need one of its two terminals. Then the job of reconstruction becomes easier. Sell the entire 42nd Street site for an office block with a new bus station on the lower floors and when that’s done, unload the south building space. Even with 12 million square feet of office space coming online at the Hudson Yards over the next decade or so, there will be plenty of demand for new homes and offices in Midtown West...

If that fails, here’s another alternative: run a state-of-the art, high-speed PATH train through one of the Lincoln Tunnel’s three existing 21-foot wide tubes from the massive Secaucus junction rail and bus station in New Jersey, through Weehawken and right into the site of the current Port Authority terminal. A high-speed PATH line in a refurbished Lincoln Tunnel tube could move as many as 36,000 to 50,000 passengers an hour in each direction—far more commuters than 1,000 buses could in an hour—with no traffic jams.
Reply With Quote