View Single Post
  #175  
Old Posted Sep 22, 2021, 9:43 PM
Chisouthside Chisouthside is offline
Registered User
 
Join Date: Jul 2018
Location: Silicon Valley/Chicago
Posts: 497
Quote:
Originally Posted by bnk View Post
Year round facility has to include some kind of dome. Im not sure how they could do that without dismantling half or more of solder field. Probably would take more than a full football season to do too, 1.5 years.
the Current SF never should have been built to that size when the bears could easily sell out 100K tickets a game. It like the smallest NFL in the entire NFL, What were they thinking? Cant even host a superbowl it doesn't come close to the min requirments. The fucking UFO was out dated even before they started construction.
Id rather start over with something new next to solder field.
can a new larger stadium even fit in any of the lots south of soldier field?
Reply With Quote