The MBTA is currently extending the Fitchburg commuter rail line 4.5 miles to an under construction station called Wachusett, to be located adjacent to the Route 2 highway. Most of the funding is from the federal stimulus act.
Wachusett Commuter Rail Extension
http://transportation.blog.state.ma....extension.html