Posted Jul 8, 2022, 9:11 PM
|
|
Registered User
|
|
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,410
|
|
Update, North Temple Transit Corridor - Stacey and Witbeck Offices
Quote:
Originally Posted by Blah_Amazing
https://citizenportal.slcgov.com/Cit...howInspection=
Address: 1958 W. North Temple
Basics: Replacement of an existing 1960s era 4,300 sq ft office building with a new two-floor, 21,000 sq ft steel-frame facility designed by EDA.
Project Description (from builder):
The proposed design solution under review, is meant to replace Stacy and Witbeck's existing 1960s era 4,300 square foot office building, with a new facility, designed by EDA. The 21,000 square foot structure is to be a steel-frame, type IIB construction with an exterior material palette of brick that relates to new adjacent properties, board formed concrete, and glazing.
As Stacy and Witbeck has been instrumental in the development of the UTA TRAX system, the proposed design is meant to emphasize their direct connection to the 1940 W. TRAX stop, and encourage the use of public transit by their employees and clients.
The property itself is in a TSA-MUEC zone and is currently anticipated to score above the 125-point threshold on the Transit Station Area scoring system. As the TSA guidelines are meant to foster a communally beneficial design, EDA has taken the additional steps of registering the proposed design with the USGBC and LEED. These additional steps and guidelines are to ensure that the future structure is a responsible addition to this TSA-MUEC zone, and the surrounding community.
Project Rendering: Southeast Corner
Project Rendering: North Face
Project Rendering: West Face
Project Rendering: Southwest Corner
Project Rendering: Northeast Corner
Site Plan
North & South Elevations
East & West Elevations
Building getting replaced:
|
Last edited by delts145; Nov 19, 2023 at 1:05 PM.
|