View Single Post
  #2441  
Old Posted Jan 15, 2021, 4:17 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
the work along the Creek



block 9W (aka 410 China Basin)



Uber's fencing along Third St is mostly down. looking south from its north end



the passageway between the two buildings is still fenced-off



lighting was tough



the sidewalk in front of the southern building



skyways connecting the two buildings



the transparency of the glass is apparent in the sun



the Weill Neuroscience building also has made progress



on Fourth St, its fencing has also come down



the psychiatry center in Dogpatch, Tennessee side





Third St side



the newest affordable housing block almost done. MB Boulevard side





China Basin St side facing the playground


Last edited by timbad; Jan 16, 2021 at 11:04 PM. Reason: added link for block 9 project
Reply With Quote