Quote:
Originally Posted by harryc
May 6
|
Quote:
Originally Posted by Ned.B
The scaffolding is there to aid in installing the top two floors of glass. Apparently there was an error on the part of the curtainwall manufacturer that didn't take into account that the tower crane would no longer be available when double height curtainwall panels were manufactured instead of more manageable single modules. This was their next best solution to complete the install.
|
Been meaning to thank you for the response and free knowledge