Posted Jan 31, 2008, 9:00 PM
|
Registered User
|
|
Join Date: Aug 2007
Posts: 527
|
|
peanut gallery, I'll try to remember to bring my camera once in a while...I'm not really a big photo-taker.
Just a quick update today, as there are a couple of items of quasi-significance.
- Steel has started going up on 1500 Owens. Should be a nice view for anyone coming into Mission Bay on 280 if the edge of the freeway isn't too tall to impede visibility. I love watching steel frames go up...so much faster than concrete.
- All of the stone façade panels on 409 Illinois have been hung and the big crane is gone. Metal façade panels/window units are quickly filling the gaps.
- Piledriver is down at 335 Berry.
- Work on 555 Mission Rock has reached the third floor.
|