View Single Post
  #9581  
Old Posted Aug 9, 2016, 6:29 AM
Jjs5056 Jjs5056 is offline
Registered User
 
Join Date: Jul 2011
Posts: 1,724
I thought I had seen the data building listed in ASU's capital expenditures; obviously, I was wrong. Sorry.

As I mentioned, the permits for the Hampton Inn reference the original residential/office tower as well; perhaps it won't happen, but I'd bet that the hotel does not reach Central and leaves room for a future phase. Too bad that entire block is pretty bad at street level - the awkward Westin valet, hidden Province, converted retail on 1st St, etc. I would actually rather the lobby front another street so that Central could be lined with restaurants.
Reply With Quote