View Single Post
  #15412  
Old Posted Jul 17, 2021, 3:02 PM
Klippenstein's Avatar
Klippenstein Klippenstein is online now
Rust Belt Motherland
 
Join Date: Apr 2021
Location: Chicago, IL
Posts: 777
Quote:
Originally Posted by jpIllInoIs View Post
CREATE Project GS9 Archer Avenue /Belt Railway grade separation

USDOT Selection
Project Description
The Illinois Department of Transportation will be awarded $19,137,780 to grade separate Archer Avenue
roadway and two existing Belt Railway of Chicago (BRC) rail tracks. The project will reconstruct Archer Avenue
and lower it approximately 15 feet under a new rail bridge to serve the existing BRC tracks, add elevated
pedestrian and bicycle sidewalks under the rail bridge with lighting, relocate utilities, and install a combined
storm and sanitary sewer along Archer Ave with rehabilitated combined sewers adjacent to the project site
If this is the rail line that I think it is, they need to do that all the way down the line. As novel as it is to wait for the train on the way to Midway, this is a great step and definitely needs to happen at 55th, 63rd and all the other crossings.
Reply With Quote