View Single Post
  #640  
Old Posted Apr 23, 2018, 8:23 PM
freerover freerover is offline
Registered User
 
Join Date: Nov 2017
Posts: 2,267
Still think you guys should be patient. The building isn't close to done and there is plenty of time to cover the left side of the western wall to match the designs. The majority of their exterior marketing material feature the west side of the building so I don't think they don't think that's an important side.

Still, I don't think the building is going to look great from the southwest side but it'll look decent from the northwest including the pedestrian bridge.
Reply With Quote