The West Quarter - Phase II Takes On New and Exciting Design Upgrades

Quote:
Originally Posted by Makid View Post
Sounds like Phase 2 for The West Quarter, may be moving faster than originally thought.

From the original plan, I think they were looking to have RWP clearing out in early 2022. With it happening around May 2021, this could mean that the overall timing has sped up.

I do think it would be nice to have 3+ major projects undergoing excavation at the same time. It is this that probably lead to the speed up of Phase 2. This will allow the current workers to shift from Phase 1 to Phase 2.

I do wonder how many towers we will see continue above the Phase 2 podium. Will we see all 3 towers, just the Residential and Hotel, or just the Residential. Pre-Covid, the plan was for the Residential and the Hotel to go up immediately and the Commercial tower to be added once demand was there. Does anyone know if this is still the plan or if we may see all 3 towers rise simultaneously?

Quote:
Originally Posted by Atlas View Post
Very exciting to see West Quarter Phase II going forward. Walking from Main Street along 200 S, Block 67 feels so impenetrable right now. It's really going to be a nice urban gateway to the Vivint Arena when it's done, not to mention it may have a massive impact on the skyline. Right now, SLC doesn't have any towers that are more than a block or so from Main Street...


New renderings for West Quarter’s Phase 2 show impressive architectural and mixed-use ambition - Luke Garrott Reports - Full Article @ https://www.buildingsaltlake.com/new...-use-ambition/

Quote:
Luke Garrott - One of the worst holes in Downtown’s urban fabric will be getting filled by the second phase of the West Quarter project, whose Phase 1, along with the Salt Palace convention center hotel a block away, is sprouting a downtown skyline west of Main Street.

New renderings of the structures are out, and they are dramatic.

The 4.36 acres of Phase 2 of the West Quarter will front on 200 South, currently a dead zone of surface parking for the Royal Wood office complex at 230 West 200 South.

The project will offer 846 new residential dwellings in three buildings, the tallest of which will be 28 stories.

It also includes a 16-story office building (408,000 sf), as well as over 50,000 sf of ground-floor retail space. A 161-room hotel will be included in the 14-story residential building.

Parking will be provided in two structures, totaling 1535 stalls...Here are the new images, courtesy of Legend Partners, the project’s leasing agent.

https://www.crexi.com/lease/properti...west-100-south - Updated Phase II, As seen from the Southeast looking Northwest toward the Great Salt Lake


Updated Phase II, As seen looking toward the Northeast from the corner of 200 South and 300 West













As a comparison, here is a view of the original rendering plans

Updated from the same angle



Construction site pre-demolition of the upcoming portion of Phase II of the West Quarter.

Photo By Atlas

.