Timeline Updates - Salt Lake City International - Phase II


Larry and Tammy Pinnock take a selfie with The Canyon, an art installation at the new Salt Lake City International Airport.
(Trent Nelson | The Salt Lake Tribune)




Engineering News-Record 2021 Top 25 National Newsmakers - Michael Williams: Leading the Team to Bring the $4.5B Salt Lake City International Airport in on Time, Under Budget


Mark Shaw for the Engineering News-Record: https://www.enr.com/articles/53419-m...e-under-budget

Mike Williams loves it when a plan comes together, especially on megaprojects such as the new $4.5-billion Salt Lake City International Airport. But the veteran manager says that only happens when a project is delivered by a truly integrated team, one dedicated to solving problems together. “And it’s important to have an owner who’s involved day-to-day,” he adds.

Williams, 69, a transportation consultant for the past 40 years, says both of those elements came together in replacing the SLC airport terminal, parking garage and two older concourses, in essence creating an entirely new airport with twice the capacity of the old one. Phase one of the project finished under budget and on time in late 2020. Phase two is ongoing...


Williams (top, in yellow vest) saw the sharp decline in pandemic air travel as an opportunity to accelerate the project schedule.
Photo: SLC Airport


Williams was hired as an independent program director for the Salt Lake City Dept. of Airports Airport Redevelopment Program in November 2012 to lead the construction side of the project from its inception.

The original plan was to build out half of the two new concourses and the landside terminal in phase one while keeping the two older ones open to maintain sufficient gate counts and meet airline capacity needs, Williams says. Phase two would add the new gates, but requiring repeatedly closing one gate and opening a new one in a complex 25-step process. However, as airline passenger traffic slowed during the pandemic’s early stages, he saw an opportunity and approached the project team with a bold idea.

“Mike came to us and said, ‘What if we tear down all of the old airport at once? Not do it in smaller pieces like we planned,’” says Bill Wyatt, executive director of airports for the city. He says Williams wanted to demolish all three concourses concurrently—while keeping the gate count high enough to serve passengers—skipping multiple gate openings and closings and accelerating the project’s second phase by nearly two years.

“The airlines liked the plan because they could get into the new facilities sooner,” Williams says. But the move required some big logistical shifts, a lot of displacement and some inconvenience, including relocating many support functions and asking the airlines to use remote “hard stands” for passenger boarding and offloading while the new gates were being finished. Delta Air Lines, the airport’s main hub carrier, “never flinched” on the proposal, Wyatt says.

“It could have made a lot of people unhappy, but we decided to make it work. It was a great plan,” he adds. The new plan also allowed crews to expedite work on the central passenger tunnel, part of phase two, now scheduled to open in October 2023, much earlier than planned.


Quote:
Originally Posted by Reeder113 View Post
What’s coming to Salt Lake City International Airport: 22 new gates, more restaurants




Food and beverage:

- Auntie Anne’s.
- Blue Iguana (Local).
- Burger King.
- Hugo Coffee (Local).
- Jimmy John’s.
- Millcreek Coffee Roasters (Local, 2 locations).
- P.F. Chang’s.
- Protein Bar and Kitchen.
- Red Rock Brewery (Local).
- Rockwell’s Ice Cream (Local).
- Vessel Kitchen (Local).
- Wow Bao.


Specialty retail, news/gift and service:

- Atrium.
- Hudson Nonstop (2 locations).
- Minute Suites.
- SLC Public Market (Local, 2 locations).
- Utah Jazz Pro Shop (Local).

















October 2022

Quote:
Originally Posted by Paniolo Man View Post
I had been concerned that they would close the mid tunnel when the central tunnel opens, looks like it's a permanent fixture.


South Concourse East begins receiving Jet Bridges. 4 new gates coming in May!


Quote:
Originally Posted by Reeder113 View Post

Apron - Utility Install - Oct 19, 2022



SCE PBB delivery - Oct 19, 2022


NCE elevated deck - Oct 19, 2022


Apron 306 placement south - Oct 19, 2022

https://slcairport.com/thenewslc/reb...gress-gallery/


November 2022

Quote:
Originally Posted by Paniolo Man View Post

November 11th - South concourse as of today. Note, no jet bridges on this side yet.

Photo By Paniolo Man

Quote:
Originally Posted by Reeder113 View Post
The new taxi lane between A and B concourses is now open, which means a quicker path to the east runways. This translates to less time on the ground and more time in the air.

https://twitter.com/slcairport/statu...49562422890496



Also, sorry for the small picture, but concourse A East is coming along nicely. They're polishing the terrazzo.

Quote:
Originally Posted by Reeder113 View Post

Central tunnel. First install of drywall and lights.


South Concourse East - Finished polished terrazzo.

https://slcairport.com/thenewslc/reb...gress-gallery/


December 2022

Quote:
Originally Posted by Paniolo Man View Post

December 2nd - Snagged a few photos this morning while headed out for a few days.

Concourse A East viewed from the south.


Concourse B East viewed from the south.


Best view I could get of the other side of A east with jet bridges installed.


Since we are on the topic of places to eat, here is my personal pick. Great prices for an airport and fantastic food. Located in Concourse B right out of the mid-concourse tunnel.


Editing to add this A Concourse East pic I grabbed while we taxied.


Photos By Paniolo Man

Quote:
Originally Posted by Paniolo Man View Post
December 8th - As posted by the airport on Facebook today.



.