View Single Post
  #2009  
Old Posted Mar 1, 2018, 4:17 PM
mrnyc mrnyc is online now
cle/west village/shaolin
 
Join Date: Jul 2006
Posts: 11,708
Quote:
Originally Posted by k1052 View Post
Sending the L and the 7 into NJ makes way to much sense for it to ever be done. The flying car will arrive first.
ha yeah.

and lets not even mention bringing the 7 train down just a little ways more to connect with the L train at 11av/14st (site of the 'solar carve' office building now under construction).

people probably dont realize the tunneling for the new hudson yard 7 train extension actually already extends down 11th av to 25th st. that's where the launch box went in. so its really only 11 blocks of digging to get it down to 14st.

connecting the dots someday~!
Reply With Quote