Posted Feb 25, 2023, 8:01 AM
|
|
Registered User
|
|
Join Date: Jan 2012
Posts: 2,317
|
|
Is the track elevated?
Also, I don't know if you really need a 2nd skybridge. Skytrain tracks are not capacity-limited by headways on the tracks themselves, but from loading speeds on the stations.
You can pack a *lot* of trains onto a single dual-track rail bridge, even with 60s frequencies on the Expo.
Also, the Skybridge has a rail between the 2 Skytrain rail lines I presume is used for maintenance. Maybe that could be dug up and converted into a Skytrain track?
|