View Single Post
  #3467  
Old Posted Nov 19, 2022, 9:27 AM
Roy_Batty Roy_Batty is offline
Registered User
 
Join Date: Feb 2021
Posts: 50
Quote:
Originally Posted by Kngkyle View Post
Eh, it's basically an extension added on to Concourse C in Terminal 1. Granted an extension that about doubles the length of it. Once that is done then T2 will be demolished. In the interim while the new T2 is built the only way to access it will likely be via the existing Terminal 1 tunnel and a long ass walk. Once T2 is rebuilt there will be another underground connection with separation for international arrivals. I think the first phase only has a pedestrian tunnel but when S-2 gets built a proper people mover is to be installed.
Nice to hear they have already started T5 parking and the ground preparations for S1. Now I see what the construction sequence is:
1. Satellite 1
2. Global Terminal (including pedestrian tunnel from GT-S1)
3. Satellite 2 (including people mover from GT-S1-S2)

You mentioned in a previous post the “city” has not been very forthcoming with the timeline, which makes me wonder if this project is managed by the city of Chicago or the federal government? Or is it that the federal government allocates the money but it’s the city in charge of the construction?

Last edited by Roy_Batty; Nov 19, 2022 at 9:56 AM.
Reply With Quote