Posted Apr 14, 2012, 5:21 PM
|
 |
cities|transit|croissants
|
|
Join Date: Jul 2001
Location: Washington, DC
Posts: 18,251
|
|
I had originally left NW off, but SnyderBock indicated it should be on.
I want to be fairly strict with things being under construction, though. There are so many in planning that the list would look a lot different if it includes things that haven't broken ground yet.
So I'll remove it. Is it just the 5 miles of the NW line that needs to come off?
__________________
BeyondDC: blog | twitter | flickr | instagram | Exploring urbanism and transportation in the Washington, DC area.
|