Location: Chicago
Posts: 625
I used to work at 208 S. LaSalle while they did the JW conversion. Seemed like the timeline of that renovation spread much longer than the inital due date. Should we expect the same for Essex? Also, the cost of these hotel conversion projects is absolutley rediculous, aside from the fact that JW charges $400 a night. Marriot spent 450 million to renovate 12 floors plus 3 basement floors. Plus they picked up the tab for the elevator and lobby renovation for the office space. They could have built a 60 floor state of the art hotel for that cost. I understand the point of fixing up Classic, Beautiful, Old buildings, but at what what point does cost take over tradition? Couldnt Essex save a butt load by just tearing down the old hotel and make one massive building instead.