Posted Feb 12, 2019, 4:36 PM
|
Registered User
|
|
Join Date: Dec 2012
Location: Chicago
Posts: 6,883
|
|
Just as a point of reference: The total estimated cost of all the permits for NEMA new construction was around $305M. For Wolf Point West it was $105M. At $100M estimated cost, if that's correct, this thing is definitely not going to be 74 floors unless they cheap the hell out of it - or that estimated cost is wrong. I'm going with the under 50 floors though based on that cost which isn't optimal. Obviously better than what's there right now, but could be a bit taller.
|