Quote:
Originally Posted by Capsule F
I can't get over how expensive the addition is with only 180,000 sf added.
|
It's not just about size, but quality.
This will be quite a high-tech, high-class facility. The LEED Silver rating adds to the cost. And the jobs are union jobs: that adds to the cost, but also stimulates the local economy more than non-union jobs.