I attended the "virtual" Plan Commission this past Friday and got my submission in soon enough to make a live comment.
Here are some of the notes I took during the discussion of this proposal...
Plan Commission May 8, 2020
-subtle levels of verticality on northland south facades
-transparency at the lower level
-2 points of security near entries
-programmatically driven
-tower is singular in expression
-operable windows (this will help with texture of the N/S facade)
-mullions designed for best sun protection on E-W facades
-went from 3,500 sq ft to 16,200 sq ft green space in plaza
-19 shade trees
-LEED Gold Certified
-lee golub spoke
-11 affordable units on site for rental
condo units over $1,000 per sq ft/rental over $4 per sq ft
-$570,000,000 phase one redevelopment
-$200,000,000 for the land
-construction start 4th quarter 2021 at earliest… probably 2022
-Walsh Construction phase 1 and first units in old tower 2021 delivery
-200 key 5-star high-end hotel rooms
-IF hotel fails, possible look at additional rental/condo