View Single Post
  #2023  
Old Posted May 3, 2018, 12:59 AM
jmecklenborg jmecklenborg is offline
Registered User
 
Join Date: Jul 2003
Posts: 3,166
Quote:
Originally Posted by mattropolis View Post
Why does the Transbay terminal (excuse me Salesforce Transit Center) have to be a stub terminal? Can't tracks be theoretically extended to Oakland someday? (maybe not in our lifetimes, but our grand-kids lifetimes)
Yes, they can be extended, and that will make SF Transbay a through station. If a new terminal station is built in Oakland with 8 tracks, then the capacity of the system will be doubled. I assume that Caltrains would also be extended.

I have seen chatter elsewhere about combining BART and HSR in the same pair of new tubes. I have no idea how that would work, technically. The different rail gauges and electric sources aren't so much of an issue as would be scheduling.

Ideally there will be two new pairs of transbay tubes -- one for HSR/Caltrains and then another for BART.
Reply With Quote