View Single Post
  #1390  
Old Posted Apr 15, 2013, 7:22 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
the formal median which will prevent left turns onto Berry is now under construction at the Seventh St/RR tracks entrance to MB:



curbs are in for the next segment of Long Bridge St (between 13W and P6). blocks 2 and 3 in the distance:



and it looks like they will finish off the sidewalk around the entire block 13 - here looking north along its western side, up what will be Fifth St:



here is block 5:



a long-view shot of the public safety building:

Reply With Quote