sure would be nice to see another major building start construction, have another chunk of the MB prairie filled in. things are gradually falling silent around here...

a couple notes from this weekend...

- indeed, the spokes in the construction on the lot next to 1500 Owens do not meet up, and whatever they are doing there is confined to one corner of the parcel. curious, from the rebar and wooden framing I saw, it appears a meter-high wall will run alongside the curved path... stay tuned...

- digging has started again in the parcel of what will be the Commons in front of the HD Cancer building. remember that a deep shaft had been dug a few months ago, and filled with concrete framing, probably as part of sewer infrastructure, but had been left flush with the surface at that point. hard to tell yet what they're doing now, but they're at it again.

- planting/landscaping continues behind the Nektar building

- work continues on the drainage outlet/pumping station on the south side of the creek, and they were even there late - after 8:00p - tonight doing something

- they've cleaned up some of the detritus that had built up around the Mission Creek-7th St train-tracks crossing that has been blocked off and unused since it was basically finished over two years ago. and they may have been working on the lights the other day. signs that this may finally open soon? I'm curious/wary what this will do to traffic on Berry once it does open.

- they are installing Mission-Bay-style streetlights on the south side of 16th St, at least between 3rd and 4th, and it looks like putting in a traffic signal at the 4th St intersection. there already is a functioning one at Owens, and at 3rd of course.