View Single Post
  #219  
Old Posted Sep 22, 2009, 3:06 PM
Quixote's Avatar
Quixote Quixote is offline
Inveterate Angeleno
 
Join Date: Apr 2006
Location: Los Angeles
Posts: 7,500
According to Wright Concept, the de facto resident LA transit expert, an eastward HRT extension down Whittier is very much a possibility because the Beverly and Whittier options for the Gold Line East II have run out of steam. This time, the subway would branch off down 7th St. to serve the Historic Core before switching over to 6th St. and eventually Whittier Blvd.
__________________
β€œTo tell a story is inescapably to take a moral stance.”

β€” Jerome Bruner
Reply With Quote