This would be canceled. The owner of the project changed.
Not too soon. It's about time something happens to this site.
The developer now in charge would refurbish the existing structure by adding roughly a dozen of floors to it. It's been abandoned for long by now.
The result would be slightly shorter than what was planned first; around 150m or something.
If the design is better, I'll buy it anyway.
No rendering yet.
|