View Single Post
  #3008  
Old Posted Jul 19, 2020, 7:53 PM
Pedestrian's Avatar
Pedestrian Pedestrian is offline
Registered User
 
Join Date: Dec 2016
Location: San Francisco
Posts: 24,177
Quote:
Originally Posted by electricron View Post
There are 19 intermediate stations at least, the express HSR trains will only stop at one, that leaves 18 others to choose from for that pass to occur. It is possible to set a schedule where they need just one passing siding. Any additional passing sidings just adds flexibility to the scheduling of the trains.
I doubt they will need 19 or more passing sidings, whether they be at stations or between them.
Nobody said how many they will need but I expect there to be more than one CalTrain on the route while each HSR train travels up the peninsula (the CalTrain schedule provides much more frequent service) so they will need more than one passing track and the more the merrier because of what you call the added flexibility. I'm sure the HSR folks can figure it out.
Reply With Quote