Also, it's hilarious how tiny Merced is part of Phase 1, north of the wye and therefore the only stop on the system's only branch, thanks to the wording of Prop 1A back in 2008. Originally the wye was going to be built north of Merced, with the system's approach to the Bay Area either via the Altamont Pass or via a 20+ mile tunnel directly into San Jose (no HSR service in Gilroy or Caltrain upgrades between San Jose and Gilroy).

I'll repeat what I've posted earlier - that northward construction to Sacramento seems to make a lot of sense, even without the Pacheco Pass Tunnel and access to the Bay Area. Sacramento to Bakersfield is a distance of about 275, with a combined population of 6 million along the route. That's a very similar distance and population to the Ohio HSR plan that went down at the polls back in 1982. Similarly, no tunnels or significant bridges.