Posted Jun 24, 2020, 9:49 PM
|
Registered User
|
|
Join Date: May 2014
Location: HUNTSVILLE, AL
Posts: 46
|
|
Quote:
Originally Posted by KVNBKLYN
Considering the 7 is an A division train (narrow trains) and the L is a B division (wider trains), that wouldn't be possible without completely rebuilding the platforms along one of the current lines, so, unlikely to happen.
|
Yep, it is an expensive longshot its too bad
Last edited by ESysyn; Aug 4, 2020 at 9:21 PM.
|